Tolleson Corp. Center Building C
DESCRIPTION /
This project
started as a 580,000 tilt slab building going on a 33.5 acre site, with two
separate small TI’s. It occupies one
quarter of a property that is designed to have three similar structures on
three similar sites. During the initial
phase of construction a large distributor of soda and sport drink products
decided they would lease the facility.
RMJ was able to provide all wiring from start to finish for the site, on
and in the building and multiple pieces of owner’s equipment. RMJ still services this account when the
owner adds or encounters issues with their equipment or other systems.