Education
Description /
Typically, the greatest challenge for building an educational project is schedule. Design is usually well thought-out and financing is determined before a job starts. Availability of funds is often mandated by predetermined construction deadlines. Simply put, be ready for students by the start of the next semester, or you don’t get your money. Schedules are tight and work occurs during periods when schools aren’t in session. Pre-planning and pre-fabrication are methods RMJ uses to overcome the challenges posed by aggressive schedules. We evaluate repetitive work, and do as much “upfront” as we can. This minimizes the actual onsite installation time and expedites the construction process.