Mayo Clinic
WORK /
The work we performed was done in the original research facility located on east Shea Blvd. Isolated, dedicated wiring was required. Coordination with the medical team’s staff was necessary to reconfigure a portion of the existing electrical. Limited time frames required RMJ to work unusual shifts to “swap-over” connections from the old system to the new.